PI Integrators

Welcome to the PI Integrators feedback page!

We created this forum to hear your ideas, feature suggestions and feedback on PI Integrators. Please suggest your most important features and design change ideas on this site, and vote for your favorite ideas.

Please note that your ideas and comments posted here are visible to all other users.

  • For bugs, please open a case with OSIsoft Tech Support through myOSIsoft Customer Portal  (https://my.osisoft.com) instead of sharing them on this site.
  • For documentation feedback and bugs, please report to documentation@osisoft.com instead of sharing them on this site.

How can we improve PI Integrators?

(thinking…)

Enter your idea and we'll search to see if someone has already suggested it.

If a similar idea already exists, you can support and comment on it.

If it doesn't exist, you can post your idea so others can support it.

Enter your idea and we'll search to see if someone has already suggested it.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. Provide support for Element Attribute with Value Retrieval Method by time Not Supported when requesting sampled data with an interval

    When retrieving AF attributes with a by Time Range setting of Not supported, the integrator will not return the data for the intervals as defined by the Query.

    34 votes
    Sign in Sign in with OSIsoft
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  PI Integrator for Business Analytics  ·  Flag idea as inappropriate…  ·  Admin →
  2. AF Audit Trail is incompatible with the Integrator for BA

    Refer to the details of ticket #881602.
    In short, the integrator leads to excessive amounts of Audit records. I see at least 50% of the Audit entries being related to the Integrator, when that is only used very lightly.

    1) it should be documented that these are effectively incompatible
    2) preferred there should be a way such that the Integrator does not cause any audit records for the internal housekeeping of the tool.

    4 votes
    Sign in Sign in with OSIsoft
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  PI Integrator for Business Analytics  ·  Flag idea as inappropriate…  ·  Admin →
  3. Add AMQP message queuing (like RabbitMQ) as a target to the PI Integrator for BA

    As a BigData analyst, I need to be able to add PI information to a global AMQP message queuing middleware, RabbitMQ being one example amongst others. From this message queue other consumers will have access to PI information along with message queues from other sources for offline or streaming analysis.

    12 votes
    Sign in Sign in with OSIsoft
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  PI Integrator for Business Analytics  ·  Flag idea as inappropriate…  ·  Admin →
  4. PI Integrator end point for MQTT

    Support an end point for MQTT

    14 votes
    Sign in Sign in with OSIsoft
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  PI Integrator for Business Analytics  ·  Flag idea as inappropriate…  ·  Admin →
  5. Add Json format as output targets

    Add the possibility of adding a target as a json file format

    8 votes
    Sign in Sign in with OSIsoft
    Signed in as (Sign out)

    We’ll send you updates on this idea

    2 comments  ·  PI Integrator for Business Analytics  ·  Flag idea as inappropriate…  ·  Admin →

    If you voted for this idea, did you mean JSON format in the Text File target, or to support JSON format in a new target or existing target? Currently we support JSON format for the Apache Kafka, Azure Event Hubs, Azure IoT Hub, Amazon Kinesis Data Streams, and Amazon S3 writers.

  6. Allow to configure the format of the output file

    The actual version just allows to create a text file output. It would be nice to be able to manage the format of the columns in that target

    2 votes
    Sign in Sign in with OSIsoft
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  PI Integrator for Business Analytics  ·  Flag idea as inappropriate…  ·  Admin →
  7. Enable searching time-enabled layers using Portal map search.

    Searching the time-enabled feature layer data items using portal map search doesn’t work. According to the Esri manual, Hosted feature layers with Query enabled should be searchable.

    Attached is an example of this behavior from case #875453

    4 votes
    Sign in Sign in with OSIsoft
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  PI Integrator for Esri ArcGIS  ·  Flag idea as inappropriate…  ·  Admin →
  8. Support filtering Integrator time-enabled layers by boolean fields

    The customer is displaying grid sensors on their map. The grid sensor error attribute is a boolean, True or False. They would like to be able to filter on a time-enabled layer based on whether the sensors are in error or not.

    5 votes
    Sign in Sign in with OSIsoft
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  PI Integrator for Esri ArcGIS  ·  Flag idea as inappropriate…  ·  Admin →
  9. Support filtering Integrator time-enabled layer by date

    I would like to filter my Integrator time-enabled feature layer by date like in http://doc.arcgis.com/en/arcgis-online/create-maps/apply-filters.htm.

    8 votes
    Sign in Sign in with OSIsoft
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  PI Integrator for Esri ArcGIS  ·  Flag idea as inappropriate…  ·  Admin →
  10. Option to split date and time into separate columns

    SAP recommends using compression on column store databases to conserve RAM and disk space resources (https://blogs.sap.com/2016/08/12/how-and-why-to-do-compression-of-column-store-tables-in-sap-hana/). Since date+time values are typically unique and compression in SAP HANA is column-based, compression of timeseries data like the data published by the Integrator is more effective if date and time are in separate columns as opposed to a single time column containing both date and time.

    2 votes
    Sign in Sign in with OSIsoft
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  PI Integrator for SAP HANA  ·  Flag idea as inappropriate…  ·  Admin →
  11. Option to disable Integrator REST Services Directory

    Allow Integrator administrators to disable the Integrator's REST API Services Directory as recommended by Esri for production systems. See https://enterprise.arcgis.com/en/server/latest/administer/linux/disabling-the-services-directory.htm

    4 votes
    Sign in Sign in with OSIsoft
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  PI Integrator for Esri ArcGIS  ·  Flag idea as inappropriate…  ·  Admin →
  12. PI to Maximo integration

    When PI is used to gather equipment sensor information but Maximo is used for asset management, it would be helpful to have a simple way to get equipment information out of PI and into Maximo.  This would be useful for scheduling preventative maintenance, among other things.

    18 votes
    Sign in Sign in with OSIsoft
    Signed in as (Sign out)

    We’ll send you updates on this idea

    4 comments  ·  Other  ·  Flag idea as inappropriate…  ·  Admin →

    Thanks for the feedback and ideas so far! At this time, we have commitments and another planned release for PI Integrator for Business Analytics at the end of 2018. We will revisit this idea again after the next release. Please feel free to contact me with any questions or additional feedback.

  13. Be able to Write data to PI from Integrator Hosted Time Enabled Feature Services

    Native ArcGIS Feature Services allow for features to be updated by performing a POST to the REST endpoint to "Apply Updates".  It would be good to be able to record new values to the PI Data Archive by "Applying Edits" to the features / Elements made available for read access by the Integrator Hosted Time Enabled Feature Services.

    2 votes
    Sign in Sign in with OSIsoft
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  PI Integrator for Esri ArcGIS  ·  Flag idea as inappropriate…  ·  Admin →
  14. Overlapping Time Ranges for Continuous View updates (Rolling Publications)

    I wish that the start time of a continuous view update cycle could precede the end time of the last cycle.

    For example every day query the last 30 days of data and replace rows that have already been written to the target table with the most recent data. This would be a straightforward way to ensure that data in PI and the integrator View are the same for the last 30 days. Manual corrections up to 30 days old could then be captured automatically.

    2 votes
    Sign in Sign in with OSIsoft
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  PI Integrator for Business Analytics  ·  Flag idea as inappropriate…  ·  Admin →
  15. Allow English PI Time to be used regardless of integrator language settings

    Other products (such as DataLink) will allow for English PI Time to be utilized regardless of the language settings. For instance, both "*-8h" and "*-8horas" will work in DataLink if Spanish is the selected language. However, only "*-8horas" will work if Spanish is the selected language for the integrator in the UI.

    The request is to bring the integrator more inline with how other OSIsoft products handle PI Time in different languages.

    4 votes
    Sign in Sign in with OSIsoft
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
  16. Schedule to publish a view certain days of the week or month

    The possibility of publishing as view certain days of the week or month.

    For example publish the view
    - The first 15 days of the month.
    - Different days in a month: 1,5,11,22..
    - Every Monday, Wednesday and Friday

    This will allow to have the data right when needed being able to schedule properly analyzing tasks.

    5 votes
    Sign in Sign in with OSIsoft
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  PI Integrator for Business Analytics  ·  Flag idea as inappropriate…  ·  Admin →
  17. Support different TimesStamp formats when Modifying Views

    Currently it is not possible to change the TimeStamp format from MM/dd/yyyy 12h AM/PM to other formats. Since there are many potential different data endpoints, it may be a good idea to allow users to change to other formats, such as 24h Military time.

    7 votes
    Sign in Sign in with OSIsoft
    Signed in as (Sign out)

    We’ll send you updates on this idea

    2 comments  ·  PI Integrator for Business Analytics  ·  Flag idea as inappropriate…  ·  Admin →
  18. Have programmatic API and framework kit for Integrators

    Many partners we work with would like to be able to configure views and data output from PI Integrator for BA directly from within their Analytics tools. This could also allow for better integration with third party analytics tools and open an OEM/Reseller market for OSIsoft partners.

    11 votes
    Sign in Sign in with OSIsoft
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  PI Integrator for Business Analytics  ·  Flag idea as inappropriate…  ·  Admin →
  19. Add support for allowing the user to specify the file extension for ADLS

    Currently, it is not possible to set the file extension that is published to Azure Data Lake Store by the PI Integrator for Microsoft Azure. It is currently hardcoded to .txt format.

    The end user should have the option to choose which file format (txt /csv/etc) that is to be eventually published to ADLS.

    1 vote
    Sign in Sign in with OSIsoft
    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  PI Integrator for Business Analytics  ·  Flag idea as inappropriate…  ·  Admin →
  20. Aggregate data across event frames

    As a PI admin using the integrator with event frames for reporting, I would like the integrator to calculate summaries across event frames. For example, I'm interested in the average value of an attribute from the beginning of one phase to the end of the operation, where the phase and operation events are generated by a batch interface.

    1 vote
    Sign in Sign in with OSIsoft
    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
  • Don't see your idea?

Feedback and Knowledge Base

Posted ideas will have one of the following statuses.
Full definition of these statuses can be found on the Home Page.
No status
NEEDS MORE DISCUSSION
RESEARCHING/EVALUATING
DECLINED
PLANNED
STARTED/IN DEVELOPMENT
IN BETA
COMPLETED